Revolutionary Subsidy Opportunity for Ultra-Fast Charging Stations with Battery Storage
The Czech Ministry of Transport has announced a new subsidy program under the Transport Operational Program, focused on building publicly accessible ultra-fast DC charging stations combined with battery energy storage. This program represents a unique opportunity for charging infrastructure operators, logistics companies, and owners of commercial premises.
Key Program Parameters
Support Level
The program offers up to 60% of eligible expenses with the following structure:
| Component | Maximum Subsidy | |-----------|----------------| | Charging station up to 50 kW | max. 900,000 CZK/station | | Charging station over 50 kW | 900,000 CZK + 10,000 CZK/kW over 50 kW | | Battery storage | 13,000 CZK/kWh capacity |
Who Can Apply?
The program is intended for all owners of publicly accessible charging infrastructure, including:
✅ Charging network operators – expansion of existing infrastructure ✅ Logistics companies – depots for electric trucks ✅ Highway rest area owners – highway charging hubs ✅ Industrial parks and shopping centers – publicly accessible fast charging ✅ Municipalities and cities – including Prague
Minimum Technical Requirements
⚡ At least one ultra-fast charging station with 300 kW or more power 🔋 Mandatory battery storage integration 🌱 Powered by renewable energy sources 🌍 Public accessibility of the station
Important Dates
📅 December 12, 2025 – Application period opens 📅 March 31, 2026 – Application deadline 📅 June 30, 2029 – Eligible expense deadline 📅 December 31, 2029 – Project completion deadline
Recommended Technology: AUTEL MaxiCharger DS600L
For meeting program requirements, we recommend the AUTEL MaxiCharger DS600L system – the most advanced charging platform with liquid-cooled power modules:
🔋 Modular architecture – 60 kW and 120 kW modules ⚡ Up to 3 MW power when clustering 5 units 🔌 10 charging outlets from one cabinet 📊 Over 97% efficiency thanks to AI-managed full-matrix scheduling ❄️ Liquid cooling for maximum reliability 🛡️ Redundant architecture – operation even during partial failure
Start Today!
Preparing a quality application takes time. With the deadline of March 31, 2026, we recommend starting preparation as soon as possible.
📞 Contact us → 🗺️ ZAspot station map → 📊 Current spot prices → 🔌 AUTEL products →
Source: Czech Ministry of Transport, Transport Operational Program



